Cast Iron Bearing Sleeve

Production capacity can reach 500 tons per month, large quantity priority, quickly solve the problem of consumption.

Send Inquiry

Product Description

After-sales tracking product quality, continuous improvement, skilled in the casting process adjustment, so as to solve the product loose, sand holes, porosity of the common casting problems.

 

1. Defects such as stomata and sand holes are as low as 0.1%.

2. The chemical composition is stable up to standard (the company is equipped with pre-furnace testing equipment to test each furnace molten steel to ensure that the product is cast after reaching the standard).

3. Batch sampling before delivery, spectrometer report, double detection is safer.

4. Small margin (2mm-5mm) years of casting experience, master casting cooling steps.

5. Production capacity can reach 500 tons per month, large quantity priority, quickly solve the problem of consumption.

 

FAQ

Q:Can Your products be installed under the cold weather?

A:Yes, of course.

 

Q:Can you send your staff to install the equipment for us?

A:Yes.

 

Q:Can I only buy some spare parts from you?

A:Yes.

 

Q:Do you have any real project pictures of the equipment?

A:Yes.

 

Q:How far is your factory from the airport?

A:50 minutes by car.

 

Q:How long it will take from guangzhou to your factory?

A:1.5 hours by car.

 

Send Inquiry
For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.

Verify Code