Small margin (2mm-5mm) years of casting experience, master casting cooling steps.
1. Porosity sand hole and other defects as low as 0.1%, disappear mold process, single product casting method to reduce product defects.
2. The chemical composition is stable up to standard (the company is equipped with pre-furnace testing equipment to test each furnace molten steel to ensure that the product is cast after reaching the standard).
3. Batch sampling before delivery, spectrometer report, double detection is safer.
4. Small margin (2mm-5mm) years of casting experience, master casting cooling steps.
FAQ
Q:How many production lines in your factory?
A:Two, can simultaneously produce 10 rolling wire equipment.
Q:How far is your factory from the airport?
A:50 minutes by car.
Q:How long it will take from guangzhou to your factory?
A:1.5 hours by car.
Q:How long it takes you to provide the designing options for us?
A:One week.
Q:How do you pack the equipment?
A:We load the goods in wooden cases.
Q:You have sales target finished amount requirement to the distributor?
A:No requirement.
Q:Can I transfer the money to you then you pay to other supplier?
A:Yes.